SHEET PILING & BRACING WORKS

SAM_13561

SHEET PILING WORKS

2Temporary Earth Retaining Structure or TERS is required before any deep excavation is carried out. TERS allows earth to be cut vertical or near vertical and minimise the size of an excavation; when the price of real estates is high or space is limited.

SRI TANJONG BINA SDN. BHD. eases your troubles by providing earth retention and excavation support technique uses Sheet Piling. With your requirements or design, sheet piles are installed in sequence to designed depth along the planned excavation perimeter. Using steel sheet sections with interlocking edges, it forms a wall for temporary lateral earth support which reduces groundwater inflow and soil failure.

20140903_142958


SILENT PILER

silent piler principleThis hydraulic machine is capable of performing vibration-free installation and extraction of sheet piles. It operates by gripping previously driven piles to provide reaction force for pressing in the next pile.

The Silent Piler works on top of the reaction piles and self-travels to the next position as illustrated. This technique allows sheet pile driving at site not accessible for conventional piling techniques. Only a relatively light-weight service crane is needed to pitch the sheet piles.

Silent Piler Sequence

Available in One (1) Unit of Giken Silent Piler SA 100, we are able to cover all eventualities and offering a full service in all sheet piling situations.

Silent Pilersilent piler specs


SHEET PILES RENTAL SERVICES

Available in three types pf sheet piles: FSP III, FSP IIIA & FSP IV for your services depending on the design requirements:-

sheet-piles-specs


BRACING WORKS

Available in different sizes of I-beams, we also provide the service of bracing works in order to provide a full coverage of service for constructing a temporary earth retaining structure

4

 

20141120_110126 sam_0546